This page enables you to create, edit, and delete forecast archive records. These are the disaggregated forecasts from the product and customer combination in Demand Planning, to the product, customer, and location combination in Supply Planning.
Parameters
The Forecast Accuracy Settings table allows you to set parameters, with the values entered displayed in the Effective Parameters table. See the bottom of the page for details.
Parameter | Value |
Forecast Error Basis | Specify how the forecast error is calculated. The absolute forecast error is divided by:
|
Forecast Accuracy Measure | Specify the forecast accuracy measure:
|
Lead Time Offset | Specify the number of planning periods to be used as lead time offset for forecast error calculations. For example, for a forecast made for Week 1, specifying a value of 2 would begin to measure the forecast made in week 1 from week 3. |
Periods to Sum | Specify the number of planning periods to sum in the calculation of the Mean Absolute Percentage Error (MAPE) value. For example, specifying a Lead Time Offset value of 2 and Periods to Sum value of 3, measures the forecast made in the week 1 offset to week 3, and sums it for weeks 3, 4, and 5. |
For parameter changes to take effect, run the Refresh Forecasts for Forecast Accuracy action on the D1010 - Current Period / Plan Locking page.
Steps
Create a Forecast Archive
To create a forecast archive:
- Complete the Header Naming table:
Parameter | Value |
Current Period | Displays the default current planning period. |
Default Archive Name | Displays the archive record's system-generated name. |
Override Archive Name | Enter an alternative name for the archive record. |
Effective Archive Name | Displays the archive record name. This is the Default Archive Name value, unless the Override Archive Name value is populated. |
Comments | Enter any freetext comments for the archived record. |
- Complete the Edit Archive Scope table:
Parameter | Value |
Archive Full Horizon | Select if all the demand planning periods are kept in the archived record as the full horizon. If set to No, enter a specific number of periods in Periods to Archive. |
Periods to Archive | If the Archive Full Horizon is set to No, specify the number of periods (including the current period) to be archived from the selected file. |
Waterfall? | Specify if the forecast archive is included in the waterfall analysis. |
Forecast Accuracy? | Specify if the forecast archive is included in the forecast accuracy tables and charts. |
Consensus Plan | Specify if the consensus plan is included in the forecast archive. |
Production Plan | Specify if the production plan is included in the forecast archive. |
- The Effective Archive Scope table displays the values from the Edit Archive Scope table.
- Select Create Forecast Archive.
Edit a Forecast Archive
To edit a forecast archive:
- Select one or more of the options below in the Edit Archives pane:
Parameter | Value |
Add to Waterfall | If the Current Waterfall column is unchecked, select to add the archive record to the waterfall analysis. |
Remove from Waterfall | If the Current Waterfall column is checked, select to remove the archive record from the waterfall analysis. |
Remove from Forecast Accuracy | Select this checkbox to remove the forecast archive from the forecast accuracy tables and charts. |
- Select Update Waterfall & Forecast Accuracy.
Delete a Forecast Archive
To delete a forecast archive:
- Select Delete? against the forecast archives to be deleted.
- Select Delete Header & Forecast Archive.