This page allows you to perform forecast accuracy reporting and analysis by plan, plan input, and period against actual demand.
Use the right-hand context selector dropdown to select a product and location combination.
Parameters
The Effective Parameters (Global) table displays the globally set parameters:
| Parameter | Value | 
| GL Forecast Error Basis | Displays how the forecast error is calculated. The absolute forecast error is divided by: 
 | 
| GL Forecast Accuracy Measure | Displays the forecast accuracy measure: 
 | 
| GL Lead Time Offset | Displays the number of planning periods to be used as lead time offset for forecast error calculations. For example, for a forecast made for Week 1, specifying a value of 2 would begin to measure the forecast made in week 1 from week 3. | 
| GL Periods to Sum | Displays the number of planning periods to sum in the calculation of the Mean Absolute Percentage Error (MAPE) value. For example, specifying a Lead Time Offset value of 2 and Periods to Sum value of 3, measures the forecast made in the week 1 offset to week 3, and sums it for weeks 3, 4, and 5. | 
The Performance Over Time chart and table displays the weekly forecast accuracy performance of the Consensus Plan. A context selector in the bottom left corner of the chart and table allows you to specify the forecast accuracy measure:
Note: If the value is changed in the table, it also changes in the graph. The opposite is true if the value is changed in the graph.
| Parameter | Value | 
| Forecast Accuracy Weighted Average (%) | Displays a weighted average percentage value of the forecast accuracy measure. | 
| Forecast Accuracy Simple Average (%) | Displays an average percentage value of the forecast accuracy measure. | 
| Bias (%) | Displays the bias percentage of the forecast accuracy measure. This is calculated by error/absolute error. | 
The History vs Forecasts (Offset and Summed) chart and table provide further weekly analysis of the consensus plan performance for the Base History and Consensus Plan.