The bill of materials (BOM) Structure page displays the details and characteristics of finished goods.

Use the top-right context selector dropdown to select a product.

The graph displays the bill of materials (BOM) structure. Use the scroll functionality on the bottom right of the graph to zoom in or out.

Select a chart element to display the product details in the table below the graph.

ParametersValues
From DateThe date the finished goods will be available from. 
To DateThe date the finished goods will be available until. 
Standard CostThe cost to produce or procure the product component. 
BOM Type

Select the bill of materials type:

  • Multiplier: Component requirements as Parent Forecast multiplied by Quantity Per Parent.
  • Pass Through: Parent Forecast.
Cost Type

Select a cost type:

  • Sum: Total cost of the product using the components.
  • Loaded: Cost of the final product.
Qty PerDisplays the units required to produce the finished goods / component.
CostDisplays the total cost (the sum of all BOM components) to produce or procure the product component.
Lead TimeThe lead time to produce or procure the product component.