Override the inputs and outputs of a specified process over time at a selected location.

In 136 - Input location process BOM overrides you configure overrides for the overall bill of materials (BOM) of your manufacturing processes, at specified locations, and during defined time periods.

Process BOM Data has been configured in the Core Business Data section of the app. If any combination is missing, review the core business data.

  1. Select a product from the page-level context selector in the top right.
  2. In the Override BOM for alternative Manufacturing Versions table, for each week the system will process alternative manufacturing:
    1. Check the corresponding Make location specific override? box.
    2. Enter a location-specific override value.
  3. Select Process Master Data Changes to apply your changes.